A guide for club owners

New pickleball club launch checklist for Vietnam

From the first site visit to the first paid booking. Use these 15 tasks to budget, set up VietQR deposits and rehearse opening day.

Start the checklist ↓

15 tasks before and after opening

Check off tasks during this visit, or print the list to assign them to your team.

Before committing capital

1. Validate demand and cash flow

  • Survey clubs within a 15–20 minute trip. Record hourly prices, evening and weekend availability, roof coverage, parking and open-play sessions. Ask Zalo groups and local organizers whether they would commit to recurring slots.

  • Get local quotes for the lease deposit, fit-out, surfacing, roof, lighting, drainage and equipment. Budget separately for wages, power, upkeep, marketing, payment fees and operating cash. Allow for construction delays and wet-season disruption.

  • Divide monthly fixed costs by the contribution per paid court-hour after direct variable costs. An illustrative 90 million ₫ ÷ 150,000 ₫ = 600 court-hours per month, or 5 paid hours per court per day with 4 courts open for 30 days. This is operating break-even before recovering the initial investment.

Before signing the lease

2. Clear the site and approvals

  • Verify the landlord’s authority to lease and whether the premises can support the intended use. Get fit-out rights, operating hours, noise conditions, signage, parking, deposit, rent increases and reinstatement costs in writing.

  • Ask the local sports authority about business registration and the sports-business eligibility certificate. Verify construction, fire safety and evacuation requirements for the premises before committing to a fit-out.

  • Check flooding, road access, standing water, sun, wind-driven rain, noise exposure to neighbors and motorbike access. Measure column locations, clear ceiling height and available electrical capacity.

Before accepting the fit-out

3. Build and inspect the courts

  • Mark courts at 6.10 × 13.41 m and allow safe run-off beyond the lines. Have the contractor specify surface flatness, drainage, grip, glare control, net placement and clearance from columns or fencing.

  • Check ventilation, wind-driven rain and roof runoff on covered courts. Test outdoor drainage after rainfall. Plan seating, drinking water, toilets, motorbike parking and a clear route into the venue.

  • Play at midday and after dark. Inspect lighting, slippery spots and blind areas, post venue rules, assign opening checks and prepare first-aid supplies and incident procedures.

Before taking bookings

4. Open reservations and deposits

  • Use the same calendar for website, phone, Zalo, front-desk and coach reservations. Publish peak and off-peak prices in VND, deposit amounts, hold deadlines and the rain rescheduling policy.

  • Show the exact amount and a unique reference for every deposit. Confirm after staff verify the bank credit or the system receives reliable provider confirmation. Rehearse underpayments, late transfers, expired holds and refunds.

  • Open the Google Maps listing as a player and check the pin, hours, real photos, phone and booking link where supported. Pin the booking link and confirmation instructions in the club’s Zalo channel.

Opening week

5. Soft-open and launch

  • Invite a small group to book, transfer a deposit, receive confirmation and check in. Test simultaneous requests for one slot, a rain cancellation and shift handover. Assign someone to fix each failure before opening more slots.

  • Run beginner clinics, level-based open play or hosted mixers. Publish the per-player price, capacity, rotation rules and sign-up link. Test off-peak passes or recurring group reservations before committing to longer-term discounts.

  • Track utilization by time slot, revenue per available court-hour, repeat bookings, cancellations and deposit discrepancies. Each week adjust one thing, such as open-play scheduling, off-peak pricing or deposit reminders.

Made on
Tilda